Whaley Bridge
Another job completed in Whaley Bridge , an old paving slab floor removed , dug out to level, prepped and filled with MOT, slab insulation laid and sealed . 5m3 of concrete poured to create a new slab throughout . Tough access issues but we rigged a Kubota K008 up with a exhaust pipe extension and a pecker which made light work of the floors